The exam at a glance
| Questions | 10 to 20% of most trade exams |
|---|---|
| Time | Fastest points on the exam when practiced |
| Passing score | Applies to every exam |
| Format | Calculator allowed on most exams |
| Licensing body | Skill tested by all state exams and NASCLA |
| Test provider | All test vendors |
Mind map: the whole exam on one screen
1. Areas and Unit Conversions
This topic covers finding the area of floors, walls and lots, then converting between square inches, square feet, square yards and acres. Almost every takeoff question starts with an area, so a mistake here carries into the rest of the problem.
Key facts
- Rectangle area = length × width. Triangle area = 1/2 × base × height.
- Circle area = π × radius squared, using π = 3.1416. The radius is half the diameter.
- Trapezoid area = 1/2 × (top width + bottom width) × height.
- 1 sq ft = 144 sq in, and 1 sq yd = 9 sq ft. Divide square feet by 9 to get square yards.
- 1 acre = 43,560 sq ft = 4,840 sq yd.
- To change decimal feet to inches, multiply the decimal part by 12. Example: 14.75 ft = 14 ft 9 in.
- For odd shapes such as an L-shaped floor, split the shape into rectangles and triangles, then add the pieces. For net wall area, subtract door and window openings.
Flashcards
Exam tip: Carpet, sod and some flooring are priced by the square yard, so check whether the answer choices are in square feet or square yards before you pick one.
2. Volumes and Cubic Yards
This topic covers the volume of slabs, footings, trenches and round piers, and converting cubic feet to cubic yards. Concrete, fill and excavation are all ordered by the cubic yard, so this conversion is tested over and over.
Key facts
- Volume of a box shape = length × width × depth, with all three in feet to get cubic feet.
- 1 cu yd = 27 cu ft (3 ft × 3 ft × 3 ft). Divide cubic feet by 27 to get cubic yards.
- 1 cu ft = 1,728 cu in (12 × 12 × 12).
- Change inches to feet before multiplying: divide by 12. A 4 in slab is 0.333 ft thick and a 6 in slab is 0.5 ft thick.
- Volume of a cylinder, such as a round pier = π × radius squared × height.
- 1 cu ft of water holds about 7.48 US gallons.
- Add the waste allowance after you find the net volume: net volume × (1 + waste %).
Flashcards
Exam tip: The most common trap is multiplying by the thickness in inches instead of feet, which makes the answer 12 times too large.
3. Concrete Takeoffs
This topic applies volume math to real concrete work: slabs, continuous footings, walls and piers, with a waste factor added. Expect multi-step problems where you find each part, add them, convert to cubic yards and round up to an orderable amount.
Key facts
- Slab volume in cu yd = length (ft) × width (ft) × thickness (ft) ÷ 27.
- A 4 in slab uses 1 cu yd for every 81 sq ft (27 ÷ 0.333).
- A 6 in slab uses 1 cu yd for every 54 sq ft (27 ÷ 0.5).
- Continuous footing volume = width × depth × total length. Use the centerline length around the building so corners are not counted twice.
- Find the net volume first, then add the waste factor the question gives, such as 5% or 10%.
- Concrete is ordered in whole or partial yards, so round up, never down, when ordering.
Flashcards
Exam tip: Read whether the question wants the net volume or the amount to order with waste, because both numbers are usually among the answer choices.
Test yourself on these topics
Take the free 15-question Math & Estimating test, then save your results to unlock your Readiness Score and the mistakes bank.
4. Block and Brick Takeoffs
This topic covers counting concrete masonry units (CMU) and brick for walls, using wall area and standard units per square foot. Questions often include openings to subtract and a waste factor to add.
Key facts
- A nominal 8 × 8 × 16 CMU face, including its 3/8 in mortar joint, covers 8 × 16 = 128 sq in, or 0.89 sq ft.
- Estimators use 1.125 block per sq ft of wall for nominal 8 × 16 CMU (1 ÷ 0.89).
Flashcards
Exam tip: Subtract openings before you add waste, and always round the final unit count up to a whole block or brick.
5. Lumber and Board Feet
This topic covers measuring lumber in board feet, pricing lumber, and counting framing members such as studs and plates. Lumber is sold by the board foot or by the thousand board feet, so these questions show up on nearly every exam.
Key facts
- Board feet = thickness (in) × width (in) × length (ft) ÷ 12, using nominal sizes.
- One board foot = 1 in × 12 in × 12 in = 144 cu in.
Flashcards
Exam tip: Use nominal sizes in the board foot formula unless the question says otherwise, and make sure length is in feet, not inches.
6. Roof Pitch and Slope
This topic covers slope, pitch, rafter length and converting plan area to actual roof area for ordering shingles. These questions use simple ratios and the Pythagorean theorem.
Key facts
- Slope is the rise in inches per 12 in of horizontal run, written as 6 in 12 or 6:12.
- Pitch = total rise ÷ total span. An 8 in 12 slope on a 24 ft span has 8 ft of rise and a pitch of 1/3.
Flashcards
Exam tip: Do not mix up slope and pitch: slope is rise per 12 in of run, while pitch is rise divided by the full span.
7. Markup, Margin and Overhead
This topic covers pricing a job: adding overhead and profit to cost, and the difference between markup on cost and margin on selling price. These questions are easy points once you know which number to divide by.
Key facts
- Markup is figured on cost: selling price = cost × (1 + markup).
- Margin is figured on selling price: selling price = cost ÷ (1 − margin).
Flashcards
Exam tip: When working backward from a price, divide by (1 + markup); subtracting the percentage from the price is the classic wrong answer.
8. Payroll and Labor Cost
This topic covers figuring gross pay with overtime, the employer's payroll taxes, and labor cost from crew production rates. It ties federal payroll rules to the math of pricing labor in a bid.
Key facts
- Nonexempt employees get at least 1.5 times their regular rate for hours over 40 in a workweek (29 U.S.C. §207).
- Social Security tax is 6.2% for the employer and 6.2% for the employee on wages up to the wage base, which is $184,500 for 2026 (IRC §§3101, 3111; SSA).
Flashcards
Exam tip: Overtime is based on hours over 40 in a workweek under federal law, not hours over 8 in a day, unless the question cites a state rule.
How to pass
- Write the units next to every number. Most wrong answers come from forgetting ÷27 or ÷9.
- Convert inches to feet before multiplying.
- Markup is on cost, margin is on price. Exams love to swap them.
Frequently asked questions
How long should I study for the Math & Estimating exam?
Most working candidates need 4 to 8 weeks at 45 to 60 minutes a day. Book your exam once your Readiness Score has stayed at 80 or higher for about a week.
Is the Math & Estimating exam open book?
Calculator allowed on most exams. Check the current candidate information bulletin from Skill tested by all state exams and NASCLA for the approved reference list and tabbing rules.
What score do I need to pass the Math & Estimating exam?
Applies to every exam. The exam has 10 to 20% of most trade exams and a time limit of fastest points on the exam when practiced.
What are the most tested topics?
The outline covers areas and unit conversions, volumes and cubic yards, concrete takeoffs, block and brick takeoffs, lumber and board feet, roof pitch and slope, markup, margin and overhead, payroll and labor cost. Use the free practice test to see which ones you need most.
Get every note, flashcard and question
Single Exam
- Full Math & Estimating bank (50 questions)
- Timed exam simulations
- Study notes, flashcards & mind maps
- Spaced repetition + mistakes bank
- Readiness Score & detailed reports
- Video lessons as they release
- 5 bonuses: formula sheet, tabbing guide, study planner and more
- Pass Guarantee + 7-day refund
All-Access
- All 12 exams, including state Business & Law
- Full question banks + timed simulations
- Study notes, flashcards & mind maps
- Spaced repetition + mistakes bank
- Readiness Score & detailed reports
- Video lessons as they release
- New exams added during your access
- 5 bonuses: formula sheet, tabbing guide, study planner and more
- Pass Guarantee + 7-day refund
Summarized from official candidate information and the statutes, codes and regulations cited, checked October 2026. Confirm current requirements with Skill tested by all state exams and NASCLA.